| W.Brewer |
Camp Concrete |
Active |
| D.Gransberg |
Quantifying the Costs and Benefits of Pavement Retexturing as a Pavement Preservation Tool: Phase 2 |
Active |
| A.Cerato |
Graduate Student Recruiting into Critical Transportation Infrastructure Areas of Interest |
Active |
| B.Balasundaram |
Proactive approach to transportation resource allocation under severe winter weather emergencies |
Active |
| J.Ramsey |
Characterization and Mediation of Microbial Deterioration of Concrete Infrastructure |
Active |
| K.Hatami |
ODOT guidelines for geosynthetic reinforcement in aggregate base roadways in Oklahoma |
Active |
| H.Refai |
Accurate Vehicle Classification Including Motorcycles using Piezoelectric Sensors |
Active |
| T.Ley |
Development of a Robust Field Technique to Quantify the Air-Void Distribution in Fresh Concrete |
Active |
| T.Kang |
Relief of reinforcing congestion in beams and bent caps of concrete bridges |
Active |
| Q.Cheng |
OKCARS: Oklahoma Collision Analysis and Response System |
Active |
| R.Vaidyanathan |
Recycled Carpet Materials for Infrastructure Applications |
Active |
| S.Cheng |
Commercial Vehicle Route Tracking Using Video Detection |
Active |
| K.Mish |
Interstate 35 Bridge Instrumentation Renaissance |
Active |
| J.Pei |
Structural Identification of a Real-World Shear Critical Prestressed Concrete Highway Bridge |
Active |
| Z.Kong |
Development of Structural Health Monitoring (SHM) Guidebook for Critical Bridge Structures |
Active |
|
|
|
|
|
R.D.Barnes
|
Roadway Weather Information System and Automatic
Vehicle Location (AVL) Coordination |
Active |
|
J.Comer
|
Oklahoma’s Transportation Infrastructure: Inventory
and Impacts
|
Active |
| S.Commuri
|
Continuous real-time measurement of pavement quality
during construction
|
Active |
|
R.Bulut
|
Unsaturated Soil Moisture Drying and Wetting Diffusion
Coefficient Measurements in the Laboratory
|
Active |
| D.D.Gransberg
|
Quantifying the Costs and Benefits of Pavement
Retexturing as a Pavement Preservation Tool
|
Active |
|
K.Hatami
|
Use of MSE Technology to Stabilize Highway Embankments
and Slopes
|
Active |
|
D.V.Howard
|
Summer Internship Program
|
Active |
|
M.Kamath
|
A Decision Support System for Transportation Infrastructure
and Supply Chain System Planning
|
Active |
|
G.A.Miller
|
Effect of Suction Hysteresis on Resilient Modulus
of Fine-Grained Soils
|
Active |
|
T.Ley
|
Investigations of a Precast Bridge Deck System
|
Active |
|
N.Materer
|
Passive Wireless Corrosion Sensors for Transportation
Infrastructure
|
Active |
| K.D.Mish
|
Development of an In-Situ Fatigue Sensor
|
Active |
| K.Muraleetharan
|
Soil-Structure Interaction Studies for Understanding
the Behavior of Integral Abutment Bridges
|
Active |
|
M.Zaman |
Tube Suction Test for Evaluation of Durability
of Cementitiously Stabilized Soils |
Active |
|
A.K.Tyagi |
Laboratory Modeling of Energy Dissipation in Broken-Back
Culverts |
Active |
|
D.Jeong |
Development of an Improved System for Contract Time Determination – Phase III |
Active |
|
|
|
|
K.D.Mish
R.N.Emerson |
Bridges of the Future can be Created Here Today |
Active |
S.P.Pulat
R.G.Ingalls |
Freight Movement Model for Oklahoma |
Active |
E.A.O'Rear
S.A.Cross
S.Lewis |
Warm Mix Asphalt: Binders Rheology and Mix Performance |
Active |
| |
|
|
Radhakrishnan
Sarangan |
Methods and Tools for Studying and Improving Para transit Services |
Active |
James
Wachtstetter |
Coordinated Human Service Transportation: Impediments and Solutions at the State and Local Level |
Active |
| Marshment |
Operating and Maintenance Cost Database |
Active |
| Oberlender |
Development of On-Board Survey Manual |
Active |
| Ahmed |
Transit Safety Performance Measurement Tools |
Active |
| |
|
|
| Court Tiako |
Measuring the Mobility Impacts of Projects Competing for New Starts Funding |
Completed |
Landers
McTernan |
A Framework for Preparing Environmental Risk Assessments for the FTA Major Capital Investment Projects |
Completed |
Karabuk
Radhakrishnan
Soltani |
Paratransit Demand Response Service Quality and Cost
Enhancement Through Information Technologies |
Active |
Gilbert
James
Wachtstetter |
Coordination of Services |
Active |
Zaman
Wachtstetter |
Transportation Planning Process Web Enabled Training and Education |
Completed |
Gilbert
S.Lewis
Marshment |
Assisting the FTA Office of Research, Demonstration and
Innovation in Preparing a Strategic Research Plan |
Completed |
| |
|
|
Court
Montgomery |
Regional Bus Service |
Active |
| Ahmed |
Light Rail Transit: Pedestrian and Vehicular Safety |
Active |
Court
Jonyer |
Data Mining the National Transit Database |
Completed |
| |
|
|
| Sluss |
Truck Weight Enforcement using Advanced Weigh-in-Motion Systems |
Completed |
| Miller |
Heave in Sulfate-Bearing Oklahoma Soils due to Lime Stabilization |
Completed |
| Ramseyer |
Monitor Existing and New Bonded Overlay Projects in the State of Oklahoma |
Completed |
| Refai |
Data Network Upgrade for Roadway Traffic Counters and Monitors |
Completed |
O'Rear
S.Lewis |
Recyled Asphalt Mixes |
Completed |
Knox
Coleman |
Evaluation of the Current Test Method (AASHTO T 84) |
Completed |
Sarangan
Pei |
A Demonstration of Low-Cost Reliable Wireless Sensor for Health Monitoring of a Precast Prestressed Concrete Bridge |
Completed |
| Russell |
Self Consolidating Concrete for Prestressed Concrete Bridge Beams |
Completed |
| Russell |
Investigation of Bridge Element Strength |
Completed |
| Emerson |
Determining the Remaining Capacity of Deteriorated Timber Bridge Piles |
Completed |
| Cross |
Validation of the CoreDry and CoreReader Apparatus |
Completed |
| Zaman |
Workshop, Seminar and Website Upgrade |
Active |
| |
|
|
Coleman
Zaman |
Effect of Anti-Stripping Additives on Performance-Graded Binders in Oklahoma |
Completed |
| Wachtstetter |
Statewide Seat Belt Campaign for Oklahoma's Diverse Populations |
Completed |
Wachtstetter
Nanny |
Public Perceptions of Noise Barriers in Oklahoma |
Completed |
| Bowen |
Investigation of Feasibility of Using Continuous for Live Load Design for Steel Bridges |
Completed |
| Cross |
Evaluation of Variability in Theoretical Maximum Specific Gravity Determination |
Completed |
Ingalls
Pulat |
Freight Movement Model Development for Oklahoma Phase III |
Completed |
| Oberlender |
Application of Linear Scheduling Methods to Highway Construction Projects: Phase I |
Completed |
| Russell |
Prestress Losses in High Performance Concrete Bridges |
Completed |
| Tyagi |
Degredation Stabilizing Methodology for elected Drop Box Culverts in Oklahoma |
Completed |
| Khoury |
Permeability and Resilient Modulus of Different Aggregate Bases Commonly Used in Oklahoma |
Completed |
| Mish |
Protecting Oklahoma Transportation Infrastructure from Natural and Man-Made Hazards |
Completed |
| Pei |
"Smart Dust" Sensor Network for Intelligent Pavement Maintenance |
Completed |
| Ramseyer |
Mechanical Activation of Fly Ash for Concrete |
Completed |
| |
|
|
Court
Ahmed |
Examining the Potential Shuttle Bus Service on the Oklahoma City and Tulsa Corridor |
Completed |
| Gransberg |
Estimating Design Fees for Transportation Projects: Phase I |
Completed |
| Jeung |
Development of an Improved System for Contract Time Determination |
Completed |
| Ramseyer |
Development of Repair and Strengthening Methods for End Damage on AASHTO Girders |
Completed |
| |
|
|
| Zaman |
Evaluation of Surface Energy Characteristics of Aggregates & Binders in Hot Mix Asphalt: Phase II Year 2 |
Completed |
| Wachtstetter |
Effects of Department of Transportation Litter Campaigns |
Completed |
| Ramseyer |
Stress Monitoring of the I-40 at Lake Eufala Bridge |
Completed |
| Bowen |
Evaluation of the In-Situ Response of Steel Bridges: Field
Load Tests |
Completed |
| Emerson |
Nondestructive Evaluation of Repaired Timber Piles via
Ultrasonic and Sonic Inspection |
Completed |
| Emerson |
Durability of Cost Effective Timber Piles |
Completed |
| |
|
|
Ghosh
Olson |
Oklahoma Highway Cost Allocation Study |
Completed |
| Bowen |
Load Rating of Steel Bridges with Deteriorated Members |
Completed |
| |
|
|
Comer
Fincham |
Analyzing Impacts of Highway Construction Activities in Oklahoma |
Completed |
| Emerson |
Evaluation and Development of Cost Effective Timber Pile
Repair Techniques: Phase II |
Completed |
| Hughes |
Subgrade Stabilization using Unwashed Mine Tailings from
the Tar Creek Superfund Site |
Completed |
Fierro
Radhakrishnan |
24/7 Remote Monitoring of Work Zones and Intelligent
Decision Support System for the Safety of Motorists and
Highway Construction Workers: Phase II |
Completed |
| Halihan |
Integrated Subsurface Imaging Techniques for Detecting
Cavities in the Karst Environments of Oklahoma: Phase II |
Completed |
| Zaman |
An Alternative Method for Determization of Asphalt Content |
Completed |
Ingalls
Pulat
Shen |
Freight Movement Model Development for Oklahoma Phase III |
Completed |
| Russell |
Investigating Admixture IPANEX for use in Bridge Decks |
Completed |
| Russell |
Investigation of Stainless Steel Clad Reinforcement for Bridge Decks |
Completed |
| Zaman |
Evaluation of Surface Free Energy Characteristics of Aggregates and Binders in Hot Mix Asphalt Phase I |
Completed |
| Bowen |
I-40 Bridge over the Arkansas River |
Completed |
Russell
Bowen |
Evaluating the State of States Bridges: Systematic Review of Bridge Inspection System |
Completed |
Ingalls
Kamath
Pulat
Shen |
Development of Freight Model |
Completed |
| Emerson |
Timber Pile Repair Techniques |
Completed |
Snethen
Miller |
Quality Control Testing for Granular Materials |
Completed |
Radhakrishnan
Hougen |
Improving Work Zone Safety: Equipment Evaluation, Acquisition, and Integration (funded outside OTC sources) |
Completed |
Comer
Finchum |
Analyzing Impacts of Highway Construction Activities in
Oklahoma: Phase II |
Completed |
Havlicek
Sluss |
An Accident Analysis System for Traffic Engineering
Decision Support on a Statewide Basis - SAFE-T |
Completed |
| Zaman |
Evaluation of Surface Free Energy Characteristics of Aggregates and Binders in Hot Mix Asphalt, Phase II Year 1 |
Completed |
| |
|
|
| Bowen |
Evaluation of Permanent Formed Metal Decking as Lateral-Torsional Bracing in Bridges |
Completed |
| Gipson |
Analytical Quantification of the Basic Problems of Pavement
Behavior Under the Action of Sustained Loading |
Completed |
| Tyagi |
A Prioritizing Methodology for Scour-Critical Culverts in
Oklahoma |
Completed |
| Emerson |
Evaluation and Development of Cost Effective Timber Pile
Techniques: Phase I |
Completed |
Comer
Finchum |
Analyzing Impacts of Highway Construction Activities in
Oklahoma Phase I - Socioeconomics |
Completed |
| Tarhole |
Integrated Subsurface Imaging Techniques for Detecting
Cavities in the Karst Environments of Oklahoma: Phase II |
Completed |
Zaman
Tarefder
Coleman |
An Alternative Method for Determization of Asphalt Content |
Completed |
Radhakrishnan
Hougen
Fierron |
24/7 Remote Monitoring of Work Zones and Intelligent
Decision Support System for the Safety of Motorists and
Highway Construction Workers: Phase I |
Completed |
Shen
Ingalls
Pulat |
Modeling Oklahoma Freight Flows: A Review, Synthesis and
Model Building Procedure: Phase I |
Completed |